Wednesday, 25 November 2026 | Asia's First Monthly Magazine on e-Governance · Est. 2005
SAS Digital Sovereignty
Gujarat AI Summit
SAS Digital Sovereignty
Gujarat AI Summit
Live — 2,083 transfers tracked Updated 23-11-2026, 14:58
Live
Transfer Chhattisgarh names Ashok Juneja as new DGP, transfers DM Awasthi 1d ago Appointment DIG Tarun Nayak named official spokesperson for Madhya Pradesh Police 1d ago Transfer West Bengal government reshuffles four IAS officers across departments 1d ago Transfer Jammu and Kashmir reshuffles six Economics and Statistics Service officers 2d ago Posting 2004-batch IAS officer Ravi Kumar NG takes charge as UPSIDA CEO 2d ago Posting Srinagar Police bids farewell to 16 officers moving to new posts 3d ago Retirement Anurag Agrawal named Meghalaya interim DGP after Nongrang retires 3d ago Transfer Haryana transfers three IAS and one HCS officer in minor reshuffle 3d ago Appointment IPS officer Jitendra Singh Gangwar appointed Chairman of Bihar BPSSC 4d ago Transfer Haryana reshuffles 32 IFS officers, Shiva Kumar takes Gurugram forest charge 4d ago Promotion Chhattisgarh promotes four IAS officers to ACS and Principal Secretary ranks 4d ago Transfer MHA transfers three AGMUT cadre IAS officers from Delhi to J&K 5d ago Transfer Karnataka government transfers 26 IPS officers in major reshuffle 5d ago Retirement Anurag Agarwal takes charge as Meghalaya Acting DGP after Nongrang retires 5d ago Deputation J&K transfers JKAS officer Sabha Sarwar on deputation to Ladakh 6d ago Transfer Maharashtra reshuffles three senior IAS officers across Mantralaya departments 6d ago Transfer Uttarakhand reshuffles six IAS officers, Nitesh Kumar Jha named Secretary Urban Development 6d ago Appointment Malay Jain Named Balaghat SP in Madhya Pradesh IPS 12d ago Appointment Ajay Kumar Yadav Appointed CRPF Additional Director General 16d ago Promotion Punjab Elevates Four Senior IPS Officers to DGP Rank 17d ago Appointment K. Lakshmipriya Named GBA Special Commissioner, Karnataka 18d ago Transfer Bihar Home Department transfers Khagaria SP Bhanu Pratap Singh to Police Headquarters 19d ago Transfer Jharkhand transfers seven IAS officers, Anup Garg named Joint Secretary in Building Construction 19d ago Appointment Girish S.N. Named Odisha Health Commissioner-Secretary 20d ago Extension Maharashtra reshuffles 16 police officers, three Thane seniors get one-year extension 20d ago Posting Shailendra Kumar gets interim charge of J&K Chief Secretary post 20d ago Transfer Uttar Pradesh transfers two IPS officers across Noida and Kanpur Nagar commissionerates 21d ago Resignation Madhya Pradesh IPS officer Anurag Sujania resigns four days after transfer from Sagar 21d ago Transfer Tamil Nadu transfers three central prison superintendents amid escape incidents 21d ago Transfer Bihar Reshuffles Four Senior IAS Officers Across Key Departments 21d ago

Hover a headline to pause it · drag the rail to scrub · ← → to step · Space to pause

Metro Rail-Redefining Hyderabad

Hyderabad Metro Rail Project is full of highly advanced technical features. Some of the highlights of this project are conversions of metro tracks into precast mode and the elevated metro station design inspired by bird and cantilever structure, says NVS Reddy, Managing Director, Hyderabad Metro Rail Limited (HMRL) in conversation with Elets News Network (ENN).


Hyderabad metro rail project is the largest in the world under Public Private Partnership (PPP) model, what are the key highlights of this project?
Under this project, three high density traffic corridors (72 km) taken up in phase 1, which includes Miyapur – Lal Bahadur Nagar (29 km; 27 stations), Jubilee Bus Station – Falaknuma (15 km; 16 stations) and Nagole – Shilparamam (28 km; 23 stations). Integration and interchange has been planned with existing rail terminals, Multi Modal Transport System (MMTS) stations and Bus depots. Air conditioned “Merry Go Round” feeder buses between metro rail stations and catchment areas will be a major highlight. It will ensure “seamless travel” facility – on same ticket. The project aims at materialising an urban redesign and rejuvenation effort to transform Hyderabad into a people friendly green city.

‘Transit+’ concept means last mile connectivity with Non-Motorised Transport (NMT), pedestrian facilities and street furniture, ecofriendly stations with natural ventilation, skywalks, ramps, escalators, elevators and a host of commuter-friendly facilities.


What are the advantages of PPP model? Is it very difficult to implement PPP mode?
It is just that one needs guts and courage to carry out a PPP mode. If we have remarkable patience and willingness to do hard work, a PPP project will always be successful. We are abundant with dedicated officers who possess extraordinary skills. Further, private organisations’ flexibility, tremendous capabilities to invent and their love for advance technologies are some of the crucial elements.


How is Hyderabad Metro Rail going to help Hyderabad transform into a competitive global city?
As we have said earlier, Greater Hyderabad is a mega city that covers 625 square km of municipal corporation area and 6,852 sq km of metropolitan area. It is fast emerging as the hub of IT/ Information Technology Enabled Services (ITES), biotech, pharma and tourism sectors. Its strategic geographical location, multilingual and cosmopolitan culture, tremendous growth potential and investment-friendly economic policy are all making it an attractive destination for corporates, entrepreneurs, academicians and homemakers alike. The increasing pressure of the burgeoning population is putting Hyderabad’s Transportation System under constant pressure. The need of the hour is a robust system that is dependable, comfortable, affordable and sustainable. An efficient, safe, reliable and comfortable public transportation system is one of the prerequisites of good living.

What are the latest technologies being adapted by Hyderabad Metro Rail Limited?
Hyderabad Metro Rail Project is full of highly advanced technical features. Conversions of metro tracks into precast mode, the elevated metro station design inspired by bird (“spine and wings” concept) and cantilever structure are some of the highlights of the project. Further, the capability of precise mode eliminated the need for temporary closure/blocking of the road while erection process has also helped to execute the work at a rapid speed. The project has bagged ‘ROSPA (Royal Society for Prevention of Accidents) Gold’ award for the last 3 years. Besides, the project has also won the best Global Engineering Project of the Year 2013 award offered by the Global Infrastructure Leadership Forum at the Forum’s 6th Annual Conference held in New York.


Will you please brief us on the current status of the metro rail project in Hyderabad?
Presently, over 1,000 expatriate and Indian engineers are working on designs at various work stations. About 55 km foundations (76%), 53 km piers (73%) and about 43 km (61%) of viaduct have been completed so far. Besides, depot works at Uppal and Miyapur have been completed and precast yard works at Uppal, and pier and viaduct works is in full swing. 52 Train sets (3-car) arrived and test runs in two stretches (20 km) is on. The installation of signalling, telecom, Over Head Equipment (OHE) work at tracks is also in full swing.

Recently, on the instructions of Chief Minister Shri K Chandrashekar Rao, a senior officers’ team of Telangana led by Chief Secretary Shri S P Singh inspected the Metro rail stretch from Nangole to Begumpet (16 km) to identify the gaps, the required street level works at metro stations, feeder services, passenger security arrangements etc, so as to commission it by the middle of this year.

Appreciating the footpath improvement done by HMRL at Gymkhana and Parade Grounds and the service roads, street furniture, greenery and other beautification works done by it at Uppal and Nagole stations, Chief Secretary Shri S. P. Singh has directed us to replicate such facilities at all the Metro stations in both Nagole-Begumpet stretch and Miyapur-SR Nagar stretch (11 km) so that these two Metro stretches can be opened for passengers with full-fledged facilities.

E
Written by

Elets

Elets News Network reports on governance, public policy and digital government across India.

IAS Transfer Tracker

Live — 2,083 transfers tracked Updated 23-11-2026, 14:58

The eGov Weekly Briefing

A weekly round-up of governance news, interviews and policy analysis — in your inbox.